Lenel Lnl3300m5 Installation Manual Upd Top <2025-2026>
Installing the LNL-3300-M5 is a straightforward process when replacing existing CASI hardware. Phase 1: Pre-Installation & Power Down
+---------------------------------------------+ | LNL-3300-M5 | | | | [Ethernet Port] [Dip Switches] | | (RJ-45) S1 & S2 | | | | [TB1] Power [TB2] Downstream RS-485 | | + - GND TR+ TR- GND | +---------------------------------------------+ Power Connections (TB1) Connect a clean, dedicated 12 VDC power source to TB1: +12 VDC Power Input Pin 2 (-): DC Power Return Pin 3 (GND): Earth Ground Downstream Communication (TB2)
Lenel LNL-3300-M5 is a Mercury-powered Intelligent System Controller (ISC) specifically designed to facilitate the migration of legacy CASI M5 or M3000 enclosures to the Lenel OnGuard system
Assign the target static IP address, subnet mask, and default gateway authorized by the network administrator. lenel lnl3300m5 installation manual upd top
Define the host communication operating baud rate if using a serial connection instead of Ethernet. Switch 8: Configures the card-data format overrides. SW2: System Configuration
Lenel LNL-3300-M5 Installation Manual: Upgrading Your Legacy System
The LNL-3300-M5 features onboard DIP switches (S1 and S2) and jumpers to define communication speeds, cardholder capacities, and addressing. Adjust these prior to mounting the board. S1 DIP Switch Settings (Baud Rate and Device Address) Installing the LNL-3300-M5 is a straightforward process when
Fasten the controller using the provided screws. Ensure the board is grounded correctly to the enclosure chassis. 3. Wiring Configurations and Connectors
: The LNL-3300-M5 is plug-compatible with the 12 VDC power input, cabinet tamper, and AC power fail inputs from the legacy Power/Comm Board. Reconnect and Power Up
2-wire RS-485 multi-drop communication bus. Upstream Communication: Onboard 10/100 Mbps Ethernet port. Switch 8: Configures the card-data format overrides
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.
: Switch 8 enables encrypted communication. All other configuration settings are made in the host software.
The installation process for the LNL-3300-M5 is a straightforward "rip and replace" migration: Power Down
The baud rate for the device is configured using Switches 6 and 7. The OnGuard software currently . Therefore, you MUST set both DIP Switches 6 and 7 to the ON position .