Ensure the main ON/OFF switch (8) is accessible and the plug (b) is correctly seated in the wall outlet.
The outlet must be properly grounded to prevent electrical shocks. Space and Structural Requirements
Attach the spring arm (Type WA04) to the boom. This component allows for vertical height adjustment.
Drill holes corresponding to the size of your heavy-duty masonry anchors or lag bolts. Clean dust out of the drilled holes.
Install the safety retaining ring or stop-screw at the bottom of the pivot pin to lock it into the bracket.
With the unit mechanically secure, it's time for the electrical hookup.
Wipe the plastic housing and infrared sensors with a soft, damp microfiber cloth. Never use alcohol, ammonia, or abrasive chemical cleaners.
This is the most critical mechanical step. An unlevel bracket will cause the arm to drift or jam.
This article provides a complete, step‑by‑step manual installation guide for the Wella ClimaZon Millennium hairdressing unit. It covers tools and materials, safety precautions, unpacking and inspection, mechanical mounting, electrical connection, ventilation and drainage, control panel setup, testing and commissioning, troubleshooting, and maintenance. This guide assumes the technician has basic electrical and mechanical skills and follows local codes. Always consult the official Wella service documentation and local regulations before installation.
Turn on the main power switch located at the base or back of the head unit.
Following this guide and the official manual will ensure your Wella Climazon Millennium is installed safely and ready to deliver professional, salon-quality results for years to come.
For Pedestal Mount: Five-caster star base, adjustable pole assembly, and securing collar.
Insert the heavy lower vertical tube into the center hole of the base.
Apply a thin layer of silicone or lithium grease to the main pivot pins annually.
Бесплатная доставка от 10 000 рублей |
100% Оригинальная продукция |
Бесплатные пробники в каждом заказе |
Ensure the main ON/OFF switch (8) is accessible and the plug (b) is correctly seated in the wall outlet.
The outlet must be properly grounded to prevent electrical shocks. Space and Structural Requirements
Attach the spring arm (Type WA04) to the boom. This component allows for vertical height adjustment.
Drill holes corresponding to the size of your heavy-duty masonry anchors or lag bolts. Clean dust out of the drilled holes.
Install the safety retaining ring or stop-screw at the bottom of the pivot pin to lock it into the bracket.
With the unit mechanically secure, it's time for the electrical hookup.
Wipe the plastic housing and infrared sensors with a soft, damp microfiber cloth. Never use alcohol, ammonia, or abrasive chemical cleaners.
This is the most critical mechanical step. An unlevel bracket will cause the arm to drift or jam.
This article provides a complete, step‑by‑step manual installation guide for the Wella ClimaZon Millennium hairdressing unit. It covers tools and materials, safety precautions, unpacking and inspection, mechanical mounting, electrical connection, ventilation and drainage, control panel setup, testing and commissioning, troubleshooting, and maintenance. This guide assumes the technician has basic electrical and mechanical skills and follows local codes. Always consult the official Wella service documentation and local regulations before installation.
Turn on the main power switch located at the base or back of the head unit.
Following this guide and the official manual will ensure your Wella Climazon Millennium is installed safely and ready to deliver professional, salon-quality results for years to come.
For Pedestal Mount: Five-caster star base, adjustable pole assembly, and securing collar.
Insert the heavy lower vertical tube into the center hole of the base.
Apply a thin layer of silicone or lithium grease to the main pivot pins annually.